Order to production
Production Handoff Checklist
Confirm quote, order, artwork, supplier, size, deadline, payment and production details before a job reaches the floor.
Best for: Owners, production managers, sales reps and CS teams handing approved jobs to production.
Inside the download
What is included?
Start jobs with the right information instead of stopping the floor to chase missing context. The fields map to how the job already runs, so your team can pick it up on the next order without a setup step.
- Order status
- Customer approval
- Deposit or payment state
- Artwork approval
- Decoration spec
- Supplier PO status
- Stock or blanks
- Size run
- Due date
- Production owner
- Machine or station
- Quality check
- Delivery or install notes
- Handoff sign-off
Mini playbook
How do you get the most from it?
When to use it
- A quote has become an order and the job is about to enter production
- Sales, artwork or purchasing is handing work to the floor
- A rush job needs a fast but controlled readiness check
- A job has multiple products, suppliers, decoration methods or delivery dates
Common mistakes it prevents
- Production starts before artwork or sizes are fully approved
- Supplier PO or stock status is unclear
- The floor gets the due date but not the promise made to the customer
- No one owns a blocked item, so the job sits half-ready
Example workflow
- Confirm the approved quote became the order
- Check artwork, decoration spec, stock, supplier PO and size data
- Assign the production owner and station
- Mark blocked items before the floor starts work
- Hand off only when the job is ready to run
Comparison
Manual worksheet vs TaggIQ workflow
| Step | Worksheet version | TaggIQ workflow |
|---|---|---|
| Readiness | A job packet is built from email and memory | Readiness is checked on the connected order |
| Ownership | Everyone assumes someone else chased the missing item | Blocked items have a visible owner and next step |
| Start work | The floor stops to ask what was promised | Production sees the approved context before work starts |
The best production team cannot run cleanly from a messy handoff.
From worksheet to workflow
When does manual control start slowing the shop down?
TaggIQ treats production handoff as a readiness decision on one connected job record: quote, order, proof, purchase order, size collection, invoice and production context stay together, so the floor starts from the same truth sales promised.
Production Agent Proposed build
Chases artwork, sizes and sign-off so jobs keep moving.
Jobs sit waiting for a vector logo, a size breakdown, a proof approval or a deposit.
- Checks each job for what is missing before production
- Asks for the right thing in plain language (a vector file, not "better artwork")
- Sends size links, proof reminders and deposit requests on the schedule you approve
Two ways to start
- One agent on your current tools
- A setup fee plus a monthly agent fee, scoped after a demo and a follow-up workflow discussion.
- The TaggIQ platform
- Quotes, orders, production and invoicing in one platform, with AI that drafts alongside your team. 14-day free trial.
Other agents that help here
See all AI agents and what each one does.
Read the full picture
The print & promo workflow guide
This worksheet is one step in the operating path. The guide shows how quoting, proofing, purchase orders, size collection, invoicing and payment connect, quote to payment without spreadsheet chaos, step by step.
Where this fits next
FAQ
Common questions
When is a job ready for production?
When the accepted quote, customer approval, artwork approval, supplier/order status, size data, deadline, payment state and production instructions are all clear enough that the floor does not need to stop and ask sales what was promised.
Who should own the handoff?
One named person should own the handoff, even if sales, artwork, purchasing and production all contributed. Without one owner, missing details become everyone's problem and no one's responsibility.
What should not be handed to production yet?
A job with unapproved artwork, uncertain stock, missing size quantities, unclear decoration placement, unresolved price changes or a vague due date should not be treated as ready. Move it to a blocked state and name the next action.
How does TaggIQ make handoff simpler?
TaggIQ keeps quote, order, proof, purchase order, size collection, invoice and production context connected, so the handoff is a state change on one record rather than a fresh job packet assembled from memory.
Free resources
The next worksheet for this workflow
Keep the same discipline moving through the job.
Artwork Approval Checklist
Stop vague proof approvals from becoming reprints, disputes and production delays.
Get the checklistPurchase Order Template
Reduce supplier callbacks, wrong items and late surprises.
Get the template
See TaggIQ on a job from your shop.
Request a guided demo of the workflows that matter to you, from quoting and customer updates to production and invoicing.
Book a demo Try the platform free for 14 days
No preparation needed. We will tailor the walkthrough to your shop.